This document aims at ensuring that Uzbekistan electricity sector is able to power the country over the decade 2021-2030 in a sufficient, secure and sustainable way. It defines mid-term and long-term objectives and directions for the development of power sector in the country, priorities and benchmarks as well as arrangements aimed at ensuring the efficiency and effectiveness of the government’s energy policy at different stages of practical implementations guaranteeing achievement of planned goals.
The main objectives of this document are 1) to find how to satisfy the country’s electrical power demand in full through domestic generation without dependence on energy imports and thus ensuring energy security; 2) improvement of national economy’s energy efficiency with parallel reductions in energy intensity achieved through, inter alia, creation of economic mechanisms to stimulate rational use of electrical power by consumers; 3) increasing energy efficiency of generation, transmission and distribution of electrical power to satisfy the growing demand; 4) reduction of power equipment wear through consistent renewal, increasing reserves in generation and transmission assets; 5) development and expansion of renewables use and their integration into the unified power system; and 6) development of efficient basic electricity market model.
- Home
- ›
- Uzbekistan
- ›
- Search results
- ›
- Concept note for ensuring electricity supply in Uz...
Concept note for ensuring electricity supply in Uzbekistan 2020-2030
Sectors: Energy
The note notably sets targets for electricity generation from wind and solar sources.
Examples:
Resilient infrastructure, Fossil fuel divestment, Net zero growth plan, Sustainable fishing
Main document
Concept note for ensuring electricity supply in Uzbekistan 2020-2030
PDF
Other documents in this entry
Concept note for ensuring electricity supply in Uzbekistan 2020-2030
HTMLDocument preview is not currently available
We are developing the ability to detect targets in documents. Get notified when this is ready.
- Implementation of 62 projects is envisaged in 2020-2030 including construction of 35 HPPs totalling 1537MW and modernisation of 27 existing HPPs with 186MW capacity added.Energy: Renewable Energy: Hydro · Target year: 2030
- Construction of 3GW wind and 5GW solar power capacities by 2030.Energy: Renewable Energy · Target year: 2030
Timeline
ShowNote
The summary of this document was written by researchers at the Grantham Research Institute . If you want to use this summary, please check terms of use for citation and licensing of third party data.