This plan was prepared by the National Development Planning Commission. The extensive, wide-ranging document seeks to provide the country with reliable and robust national energy infrastructure stimulating economic growth, poverty alleviation and general wellbeing, as per the objectives set out in the Long-term National Development Plan (LTNDP). The plan notably aims to develop the production and use of energy from renewable and nuclear sources. It also aims to accommodate the use of electric vehicles and rail.
The document further contains non-mitigation measures, including on housing, food security and disaster risk management. it charges the government to improve drainage, and reduce the risks of flooding and coastal erosion on people, the economy, environment and society.
- Home
- ›
- Ghana
- ›
- Search results
- ›
- Ghana Infrastructure Plan 2018-2047
Ghana Infrastructure Plan 2018-2047
2019Disaster Risk Management, MitigationPolicyPlan
Sectors: Buildings, Energy, Industry, Transport, Waste, Water
Examples:
Resilient infrastructure, Fossil fuel divestment, Net zero growth plan, Sustainable fishing
Main documents
Ghana Infrastructure Plan 2018-2047 (Volume One)
PDF
Ghana Infrastructure Plan 2018-2047 (Volume Two)
PDF
Timeline
ShowNote

The summary of this document was written by researchers at the Grantham Research Institute . If you want to use this summary, please check terms of use for citation and licensing of third party data.