The objectives of this Law are to define the instruments of territorial and urban planning, their content, scope, reach, approval bodies, and management. Urbanisation and building approvals are regulated to be granted through the final approval of the building permit, when the territorial and urban planning determinations and regulations established in the territorial and urban planning instruments, the technical standards for construction, the prevention of natural and anthropogenic hazards, and the impact of climate change have been complied with. The Ministry of Science, Technology and the Environment and the Ministry of Construction are responsible for ensuring the integration of climate change adaptation in land use and urban planning, and housing construction, respectively.
On undevelopable land, the competent authority may, in exceptional cases, authorise the construction of isolated infrastructure, buildings, and dwellings necessary for the exploitation of these territories, avoiding risk situations by ensuring preventive protection or adaptation works in the face of exposure to natural or anthropogenic hazards or the expected impact of climate change.
In coastal areas and areas vulnerable to climate change, planning shall take into account the principles of depopulation and reduction of population density, as appropriate.

