- Offshore Wind Energy Roadmap 2030
This roadmap is set out by the Dutch Ministry for the Economy and Climate to foster new offshore wind generation in the country by 2030. The plan sets out a target of additional capacity of 4.5 GW to be added by 2023 and 7 GW between 2024 and 2030. The document also deals with grid connection for specific wind farms.