Skip to content
Climate Change Laws of the World logo globe
Climate Change Laws of the World logo text
  • Home
  • /
  • Search
  • /
  • Cambodia
  • /
  • Prakas N.470 on the Establishment of General Requirement of Electric Power Technical Standards

Prakas N.470 on the Establishment of General Requirement of Electric Power Technical Standards

Geography
Year
2004
Document Type
Policy

Summary

This document establishes the general requirements of Electric Power Technical Standards in the country.It addresses the following sub-sectors: 1) Fuel Oil Generation Plant and Steam Power Plant, 2) Hydro Power Plant, 3) Transmission and Distribution System, 4) Renewable Energy System, and 5) House and General Building Wiring System.

Documents

About this policy

Year
2004
Most recent update
16/07/2004
Response areas
Mitigation
Topics
, ,  

 Topics mentioned most in this policy  
Beta

See how often topics get mentioned in this policy and view specific passages of text highlighted in each document. Accuracy is not 100%. Learn more

Group
Topics
Renewable energy
Fossil fuel
Greenhouse gas
Economic sector

Note

CCLW national policies

The summary of this document was written by researchers at the Grantham Research Institute . If you want to use this summary, please check terms of use for citation and licensing of third party data.