Resolution 370 regulating the subsidies for power transmission lines to facilitate access to the grid for renewable energy installations
Summary
The regulation aims to contribute to reaching a 20% target of installed power generation capacity by 2020. It establishes a subsidy for power lines granting access to the grid to renewable energy installations in the event that the demand is lower than expected, reducing the investment risks. The agent applying for the subsidy shall be facilitating access to the grid to at least three renewable energy installations. The subsidy is capped at USD700, 000 and applies between the sixth and the tenth year of exploitation of the power line.
Documents
Document
Topics 
Beta
About this policy
Year
2012
Most recent update
18/07/2012
Geography
Response areas
Mitigation
Sectors
Energy
Topics
, ,  
 Topics mentioned most in this policy  Beta
See how often topics get mentioned in this policy and view specific passages of text highlighted in each document. Accuracy is not 100%. Learn more
Group
Topics
Policy instrument
Renewable energy
Economic sector
Note

The summary of this document was written by researchers at the Grantham Research Institute . If you want to use this summary, please check terms of use for citation and licensing of third party data.