Skip to content
Climate Change Laws of the World logo globe
Climate Change Laws of the World logo text
  • Home
  • /
  • Search
  • /
  • Spain
  • /
  • Royal Decree 359/2017 Setting a Call for the Allocation of the Specific Compensation Regime for New Plants of Electricity Production from RES, Located in the Mainland Electricity System

Royal Decree 359/2017 Setting a Call for the Allocation of the Specific Compensation Regime for New Plants of Electricity Production from RES, Located in the Mainland Electricity System

Geography
🇪🇸 Spain
Year
2017
Document Type
Policy

Summary

Royal Decree 359/2017 Setting a Call for the Allocation of the Specific Compensation Regime for New Plants of Electricity Production from RES, Located in the Mainland Electricity System

Documents

Each policy in our database can contain one or more documents.

Document
Topics
Energy supply mitigationEnergy supply sectorRenewable energyFinance flow+ 9 more

 Topics mentioned most in this policy

See how often Topics get mentioned in this policy and view specific passages of text highlighted in each document.

Group
Topics
Target
Just transition
Climate justice
Renewable energy
Economic sector
Finance

Note

NewClimate Institute

This entry and summary were provided by the Climate Policy Database. If you want to use the summary, please see the terms of use for citation and licensing of third party data.