  • Royal Decree 650/2017 Setting a Quota of 3000 MW of Installed Capacity for New Plants of Electricity Production from RES Located in the Mainland Electricity System, Which Can Receive the Specific Compensation Regime

Royal Decree 650/2017 Setting a Quota of 3000 MW of Installed Capacity for New Plants of Electricity Production from RES Located in the Mainland Electricity System, Which Can Receive the Specific Compensation Regime

Geography
🇪🇸 Spain
Year
2017
Document Type
Policy

Summary

This Royal Decree establishes a power quota and the rules for a new call for the granting of specific remuneration to new installations for the production of electricity from wind and photovoltaic technologies in the peninsular electricity system of Spain. The greater growth potential of such technologies was witnessed through the capacity of such technologies to compete with conventional technologies in price and in terms of the high volume of power offered, through a previous auction called.
Under this Decree, the allocation of this specific remuneration scheme and the standard value of the initial investment shall be determined by means of a competitive competition procedure.

Documents

Each policy in our database can contain one or more documents.

Document
Topics

 Topics mentioned most in this policy

See how often Topics get mentioned in this policy and view specific passages of text highlighted in each document.

Group
Topics
Target
Climate justice
Renewable energy
Economic sector
Finance

Note

Grantham Research Institute

The summary of this document was written by researchers at the Grantham Research Institute . If you want to use this summary, please check terms of use for citation and licensing of third party data.