The Integrated System Plan (ISP) is a 25-year roadmap to transition the National Electricity Market (NEM) to net zero by 2050, released by the Australian Energy Market Operator. The Plan confirms that renewable energy connected with transmission and distribution, firmed with storage and backed up by gas-powered generation, is the lowest-cost way to supply electricity to homes and businesses as Australia transitions to a net zero economy.


The Plan identifies almost 10,000km of new transmission lines are required by 2050 to connect new sources of generation and meet reliability targets at the lowest cost to consumers. Five projects, or 2,500 km, are already underway as committed and anticipated projects. The plan identifies a further 12 projects that are actionable and should continue through planning and delivery.


Crucial technologies factored into the roadmap are domestic rooftop solar panels and associated batteries, smart systems and electric vehicles, also known as consumer energy resources. Home batteries, if well-coordinated, can save consumers around $4.1 billion in avoided costs for additional grid-scale investment.

Documents

Each policy in our database can contain one or more documents.

Document
Topics
Main document
Plan
English (Original Language)
Energy supply mitigationRenewable energyFossil fuelEnergy supply sector+ 50 more

 Topics mentioned most in this policy

See how often Topics get mentioned in this policy and view specific passages of text highlighted in each document.

Group
Topics
Target
Policy instrument
Risk
Impacted group
Just transition
Climate justice
Renewable energy
Fossil fuel
Greenhouse gas
Economic sector
Adaptation/resilience
Finance

Note

Grantham Research Institute

The summary of this document was written by researchers at the Grantham Research Institute . If you want to use this summary, please check terms of use for citation and licensing of third party data.