These Guidelines have the following objectives to facilitate renewable capacity addition and fulfilment of Renewable Purchase Obligation (RPO) requirement of distribution licensees; to provide a transparent, fair, standardized procurement framework based on open competitive bidding with appropriate risk-sharing between various stakeholders to enable procurement of power at competitive prices in consumer interest, improve bankability of projects and ensure reasonable returns to the investors; and to provide for a framework for the inter-state/ intra-state, long-term, sale-purchase of power as a further measure to derisk the sector. The Guidelines cover the bidding and contracting processes.
In Circular No. 117/44/2018-Wind-Part(1) dated 9 January 2023, the Ministry of New and Renewable Energy outlined its decision regarding bidding for wind energy projects to ensure faster capacity addition in the wind sector. The Ministry decided that bids of a cumulative capacity of about 8 GW will be issued each year from 2023 to 2030. Each bid will include composite sub-bids for all 8 windy states, and the technical and financial bids will be placed in two separate envelopes. The financial bid will only be opened when the bidders qualify in the technical bid. Amendments were made to the Guidelines accordingly.