This is the 2nd Stage of 10,000 MW Crash Programme, and is intended to accelerate the development of geothermal power. The regulation specifies that Indonesia should generate 3,967 MW of geothermal power by the year 2014.
Ministerial Regulation 15/2010 Re. 10,000 MW Crash Programme
Summary