Offshore Wind Energy Lease Rules, 2023

Geography
🇮🇳 India
Year
2023
Document Type
Policy

Summary

These Rules stipulate the conditions under which the central government may lease out the offshore area within the Exclusive Economic Zone for offshore wind energy and offshore wind transmission projects. The lease will be for an initial period of three years for resource measurement and related study/survey activities, further extendable for adequate reasons by an additional two years. There may then be an extension of 35 years and further extensions on a case-by-case basis for the construction and operation of offshore wind energy projects.


Under the Rules, the lessee is required to decommission all installations and clear the eabed from all obstructions created by the project.

Documents

Each policy in our database can contain one or more documents.

Document
Topics
Main document
Rules
English (Original Language)
Energy supply mitigationRenewable energyWind energyEnergy supply sector+ 15 more

 Topics mentioned most in this policy

See how often Topics get mentioned in this policy and view specific passages of text highlighted in each document.

Group
Topics
Policy instrument
Risk
Climate justice
Renewable energy
Economic sector
Adaptation/resilience
Finance

Note

Grantham Research Institute