These Rules stipulate the conditions under which the central government may lease out the offshore area within the Exclusive Economic Zone for offshore wind energy and offshore wind transmission projects. The lease will be for an initial period of three years for resource measurement and related study/survey activities, further extendable for adequate reasons by an additional two years. There may then be an extension of 35 years and further extensions on a case-by-case basis for the construction and operation of offshore wind energy projects.
Under the Rules, the lessee is required to decommission all installations and clear the eabed from all obstructions created by the project.