  • Order of May 6, 2017 - Establishing the Conditions of the Compensation Mechanism for Electricity Generated from Wind Energy with a Maximum of 6 wind turbines

Order of May 6, 2017 - Establishing the Conditions of the Compensation Mechanism for Electricity Generated from Wind Energy with a Maximum of 6 wind turbines

Geography
🇫🇷 France
Year
2017
Document Type
Policy

Summary

Order of May 6, 2017 taken pursuant to Article D. 314-23 of the Energy Code setting out conditions for benefiting from the additional remuneration for electricity production installations using mechanical wind energy with a maximum of 6 wind turbines.Before July 2022, producers may benefit from a supplementary remuneration contract, under the conditions provided for in this decree, for the installations mentioned in 7° of article D. 314-23, within the limit of 6 wind turbines per installation and 3MW of nominal power for each wind turbine at most.


In 2022 it was amended by other orders ( Order April 27, 2022 and Order December 29, 2022), which brought new specific conditions regarding the eligibility to the compensation mechanism and the amount of the allocated premium.


Overall, the order aims at promoting wind energy through a market premium. The premium tariff is allocated over a limited period of time, 20 years in the case of wind energy.