This Order F. No. 09/13/2021-RCM made by the Ministry of Power stipulates the Renewable Purchase Obligations (RPO) for various renewable energy sources. For instance, in the year 2029-30, the wind RPO is 6.94% of total electricity consumption, the hydro power RPO (HPO) is 2.82%, and the other RPO is 33.57%, constituting a total RPO of 43.33%. The Order stipulates a capping price for renewable energy certificates for hydro power with an annual escalation, and hydro power imported from outside India does not meet the HPO.
There are also stipulations for the amount of storage as a percentage of the total energy consumed for solar/wind energy.
Corrigendum F. No. 09/13/2021-RCM was made on 19 September 2022 to recognise the significant amount of investment for wind power projects compared to other renewable energy technologies, benefitting states that have invested in wind power by considering the inclusion of wind energy, where it was above 7% of total energy consumption and consumed before 31 March 2022, in the RPO.