The Renewable Generation Obligation as per the Revised Tariff Policy, 2016 is contained in a Ministry of Power Resolution F. No. 09/02/2022-RCM.–1.0 dated 27 February 2023. The Resolution states that any generating company establishing a coal/lignite-based thermal generating station and having the Commercial Operation Date (COD) of the project on or after 1 April 2023 shall be required to establish renewable energy generating capacity (in MW) i.e. Renewable Generation Obligation (RGO) of a minimum of forty percent (40%) of the capacity (in MW). Alternatively, it shall procure and supply renewable energy equivalent to such capacity.
Renewable Generation Obligation for Coal/Lignite-Based Thermal Generating Stations
Summary
Documents
Each policy in our database can contain one or more documents.
Document
Topics
Main document
Resolution
English (Original Language)
Fossil fuelCoalEnergy supply mitigationRenewable energy+ 4 more
 Topics mentioned most in this policy
See how often Topics get mentioned in this policy and view specific passages of text highlighted in each document.
Group
Topics
Target
Renewable energy
Fossil fuel
Economic sector
Finance
Note