Skip to content
Climate Change Laws of the World logo globe
Climate Change Laws of the World logo text
  • Home
  • /
  • Search
  • /
  • India
  • /
  • Renewable Generation Obligation for Coal/Lignite-Based Thermal Generating Stations

Renewable Generation Obligation for Coal/Lignite-Based Thermal Generating Stations

Geography
🇮🇳 India
Year
2023
Document Type
Policy

Summary

The Renewable Generation Obligation as per the Revised Tariff Policy, 2016 is contained in a Ministry of Power Resolution F. No. 09/02/2022-RCM.–1.0 dated 27 February 2023. The Resolution states that any generating company establishing a coal/lignite-based thermal generating station and having the Commercial Operation Date (COD) of the project on or after 1 April 2023 shall be required to establish renewable energy generating capacity (in MW) i.e. Renewable Generation Obligation (RGO) of a minimum of forty percent (40%) of the capacity (in MW). Alternatively, it shall procure and supply renewable energy equivalent to such capacity.

Documents

Each policy in our database can contain one or more documents.

Document
Topics
Fossil fuelCoalEnergy supply mitigationRenewable energy+ 4 more

 Topics mentioned most in this policy

See how often Topics get mentioned in this policy and view specific passages of text highlighted in each document.

Group
Topics
Target
Renewable energy
Fossil fuel
Economic sector
Finance

Note

Grantham Research Institute

The summary of this document was written by researchers at the Grantham Research Institute . If you want to use this summary, please check terms of use for citation and licensing of third party data.